logo

k-deck aluminium slab formwork with Early Stripping Drop Head

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


The Formwork Experts. Structure

formwork Dokadek 30 with drop head' User Information booklet. When using Dokadek 30 with drop head for structures with high floor,to,ceiling heights, also follow the directions in the 'Alternative methods of assembly' User Information booklet. Panel size Permitted slab thickness Deflection as per DIN 18202 1.22x2.44m 30 Line 6

How KITSEN Aluminum Formworks Installed

Set position steel bars| Use steel bars welded on the vertical steel bars of the wall /column as the positioning point when installing; the height is 40,60mm from the floor, and the spacing does not exceed 800mm; the internal corner position must ensure at least one positioning bar in each direction; The length of the positioning steel bar shall be equal to or smaller than the cross section of !!!

WF - PLYTEC

Wonder Formwork (WF) is a panel!drop concrete formwork system with early!stripping mechanism` It provides a systematic| modular formwork solution to the construction of beam and slab structural elements and suits generally all in!situ construction methods and conditions`

Formwork Wiki - MEVA Formwork

Drop head| Supplementary part for standard props which facilitates lowering supported or suspended beams with just one hammer blow| The lowering of the drop head allows for an early stripping of the beams and slab formwork panels| The head plate of the drop head still supports the slab during the lowering procedure and also afterwards|

Panel floor formwork Dokadek 20 - The Formwork

42 Floor formwork around edges 52 Early stripping without drop head without activation of the slab 54 Additional areas of use 54 Sloping slabs 58 Additional precautions for slab thicknesses of up to 50 cm 62 General remarks 62 Transporting| stacking and storing 74 Cleaning and care of your equipment 76 Reshoring props| concrete technology and !!!

Aluminium formwork CC-4 | ULMA

The CC|4 is a recoverable modular aluminium formwork optimised for the construction of solid or lightened slabs with excellent concrete finishes:With an aluminium structure and a fast and effective stripping system· it is designed to obtain reductions in assembly and dismantling times with high safety standards guaranteed for the worker:

Good Formwork for Homes| Concrete Construction

The slabs are poured using the MevaDec slab formwork and applying the drop|head|beam|panel method! The drop head allows for early stripping· the props remain under the poured slabs while the panels and beams can be removed early for the next slab! Thus the site needs two sets of props but only one set of panels and beams to do the entire slab jobs!

DROP HEAD POST HANDSET SHORING SYSTEM Atlas

Atlas A-DECK is a drop-head post shore handset shoring system designed to maximize labor productivity and reduce formwork cycle time. The primary components include high capacity post shores with drop heads- aluminum girders and LVL joists. The Atlas A-DECK system provides a high level of productivity through the use of a 8’ x 6’

How KITSEN Aluminum Formworks Dismantled

- When dismantling the slab formworks, start with the slab beam, open the lock between the beam and panels first, When removing the beams, remove the panels part by part, The prop head are used to carry the slab concrete and cannot be removed, nor can it be shaken and displaced, to minimize collision,